av鲁丝一区鲁丝二区鲁丝三区,亚洲аv天堂网最新版在线,国产成人午夜福利院,中文字幕99在线精品视频免费看

Nigeria Modernization Railway
Author: ? ?   Time:2012-09-20  Clicks:    
【Font:Big middle small

Engineering Survey

The Nigerian Modernization Railway Project is to build a new double-track standard-gauged railway from the southern city Lagos to the northern city Kano. The railway, with a full length of 1,315km and a design speed of 150km/h, is designed in accordance with Chinese railway specifications.

The railway section designed by SIYUAN is located at the southmost end of the project, with a main line of 250km and two branch lines of 8.5km and 7km respectively. In terms of the general engineering conditions, it’s a section with the highest technical content along the whole line, due to the dense vegetations and soft formation development.

On April 22, 2007, SIYUAN completed all the reconnaissance works, and then carried out the large- scale survey works for the project.

On July 13, 2008, SIYUAN advance team of 20 people arrived Nigeria for the supplementary survey works of the Nigerian Modernization Railway.

On January 18, 2011, construction commenced for the section Abuja~ Kaduna of the Railway Modernization Project in Nigeria.


Engineering Survey



Engineering Survey